Holdings Information
Guidebook to the LEED certification process : for LEED for New Construction, LEED for Core & Shell, and LEED for Commercial Interiors / Michelle Cottrell.
Bibliographic Record Display
-
Title:Guidebook to the LEED certification process : for LEED for New Construction, LEED for Core & Shell, and LEED for Commercial Interiors / Michelle Cottrell.
-
Author/Creator:Cottrell, Michelle.
-
Published/Created:Hoboken, New Jersey : John Wiley & Sons, Inc., [2011], ©2011.
-
Holdings
Holdings Record Display
-
Location:MAA LIBRARY (IKB) stacksWhere is this?
-
Call Number: TH880 .C685 2011
-
Number of Items:1
-
Status:Available
-
Location:MAA LIBRARY (IKB) stacksWhere is this?
-
Library of Congress Subjects:Sustainable buildings--Design and construction.
Leadership in Energy and Environmental Design Green Building Rating System.
-
Description:xix, 330 pages : illustrations ; 24 cm.
-
Notes:Includes bibliographical references and index.
-
ISBN:9780470524183 (cloth)
0470524189 (cloth)
-
Contents:Machine generated contents note: pt. 1 Key Concepts
ch. 1 Measuring Green
Leed Rating Systems
Key Concepts Of Leed
Owner's Perspective: Going for Gold / M. Christie Smith
Leed Certification Process
Next Steps Of Coordinating A Leed Project
Owner's Perspective: Two Questions Every Owner Must Answer for Their LEED Project / Chet M. Roach
ch. 2 Integrative Project Delivery Process
Construction Manager's Perspective: From Design to Reality / Bassam Tarazi
Differences Of A Traditional Project Versus An Integrative Project Delivery
General Contractor's Perspective: The Importance Of Integration For The Success Of Leed Projects / Travis Hall
General Contractor's Perspective: Involving A Construction Manager During Design / Michael J. Parnell
Engineer's Perspective: Integrated Design and Collaboration / Robert Diemer
Leed And Ipd
ch. 3 Building A Project Team
Tiers Of the Credentialing Process
Owner's Perspective: Building a LEED Team / Bill Stoller
What is A Leed Coordinator?
Engineer's Perspective: The LEED Challenge and the Role of Project Coordinator / Wayne Howell
Selecting The Rest Of The Team Members
Professional Perspective: The Value Of Certification / Mark Hanson
Attorney's Perspective: The Risks Of Green Building / Stephen T. Del Percio
Structural Engineer
Engineer's Perspective: Offsetting the Costs of Energy Modeling and Commissioning / Paul Meyer
Commissioning Agent
Commissioning Agent's Perspective: Selecting A Commissioning Authority / Bill Lodato
Contractor
Contracts
Waste Hauler's Perspective: How LEED Has Changed the Waste Industry / David Cardella
Coordinator's Perspective: The LEED Coordinator: No One Understands Me! / Steve Leone
ch. 4 Site Selection
Education is Key
Tax Consultant's Perspective: An Introduction To Understanding Section 179D / Dennis J. Stilger, Jr.
Questionnaire
Initial Assessment
Broker's Perspective: LEED-Certified Development Properties vs. Traditional Development Properties / Marie Taylor
Energy Provider's Perspective: Power Purchase Agreements / RJ Donnelly
Architect's Perspective: Seeking LEED CI Certification for a Hotel: The Challenges and Benefits / Michael F. Maurer
Broker's Perspective: Sustainable Design Leads to Good PR and Improved Bottom Line ... If Tenants Can Find a Way to Care / Scott Steuber
Continuing The Effort To Prepare For The Goal-Setting Meeting
ch. 5 Eco-Charette
Architect's Perspective: Collaborative Design / Gary Moshier
Prior To The Meeting
Civil Engineer's Perspective: The Importance of Deciding to Pursue LEED Early in the Design Process / Geoffrey B. Nara
Goal-Setting Meeting
Contractor's Perspective: LEED Certification: Hurdles to Success / Holly Hawkins
Owner's Perspective: The Execution of a Certified LEED NC Project / Mike Barbera
Momentum After The Eco-Charette
pt. 2 Design Phases
ch. 6 Schematic Design and Design Development Phases
Owner's Representative's Perspective: What LEED Credits are Right for You? / Chet M. Roach
Full Time Equivalent Occupants
Design Integration Sessions
Green Roof Technical Expert's Perspective: An Overview of Green Roof Assemblies and Benefits / Melissa Muroff
Addressing The Prerequisites And Credits
Architect's Perspective: Managing Passive Loads / Gary Moshier
Landscape Architect's Perspective: A Landscape Architecture Perspective on the LEED Certification Process / Aiman Duckworth
Civil Engineer's Perspective: Innovative Sustainable Civil and Site Design for a Nature Center Renovation and Expansion / Geoffrey B. Nara
Landscape Architect's Perspective: Use 3D Modeling Tools for a Quick and Accurate Measurement of Tree Shading / Aiman Duckworth
Lighting Designer's Perspective: The Role of a Lighting Designer on a Project Seeking LEED Certification / Faith E. Baum
Landscape Architect's Perspective: Educate Yourself, the Contractor, the Owner, and Landscape Maintenance Staff about the Project's Planting and Irrigation Approach / Aiman Duckworth
Architect's Perspective: Mechanical and Architectural Coordination for Energy Efficiency / Nathan Ogle
Commissioning Agent's Perspective: The Benefits of a Commissioning Agent / Brian Fronapfel
Mep Engineer's Perspective: The Benefits of the OPR and BOD / Kent D. Hoffman
Mep Engineer's Perspective: Ea Credit 1: Optimize Energy Performance Compliance Paths / William Amann
Mep Engineer's Perspective: Refrigeration Compliance for LEED / Christopher F. Zabaneh
Mep Engineer's Perspective: Engaging an Engineer / Kurt A. Scheer
Mep Engineer's Perspective: Measurement and Verification for Large-Energy-User Projects / Wayne Howell
Architect's Perspective: The National Audubon Society: Selecting Environmentally Sensitive Materials / Guy Geier
Raised-Access Floor Manufacturer's Perspective: Under-Floor Air Distribution System Contributions to LEED Certification / Scott Alwine
Lighting Designer's Perspective: Benefits of Computer Daylight Simulation / Magdalena L. DiDomenico
Preliminary Specification Review
Architect's Perspective: N20-HDR-CUH2A's New Second Office / Jorge Rodriguez
In Summary
ch. 7 Construction Document Phase
Green Roof Technical Expert's Perspective: Quality Assurance of a Green Roof / Melissa Muroff
Commissioning
Mep Engineer's Perspective: Energy Modeling Pitfalls / Aaron Dahlstrom
Whole-Building Simulation
Specification And Plan Review
Landscape Architect's Perspective: Design Water as One System / Aiman Duckworth
Leed-Online Documentation Review
GBCI Reviewer's Perspective: Top Five Tips for Submitting a LEED Project to GBCI / Martin Mechtenberg
Manufacturer's Perspective: A Manufacturer as an Owner Pursuing LEED / Julie Smith
Next Steps
Engineer's Perspective: Experiences of Gaining LEED Certification / Scott Bowman
pt. 3 Construction Phase
ch. 8 Coordination with the Construction Team
Bid Review
General Contractor's Perspective: Compliancy with LEED during Construction / Easy Foster
Training The Construction Team
Owner's Perspective: The Importance of Collaboration / David Anderson
Leed Implementation Plan
Waste Consultant's Perspective: Construction Waste Recycling: Where the Real World Meets LEED / Wayne DeFeo
Tasks During Construction
General Contractor's Perspective: LEED during Construction / Michael J. Parnell
ch. 9 Monthly Reports
Material Tracking: Getting Started
Owner's Perspective: Procurement Strategies / Steve Martorana
Manufacturer's Perspective: A Manufacturer's Approach to LEED / Melissa DeSota
Salvaged Material Broker's Perspective: Overcoming the Challenges of MR Credit 3: Materials Reuse / Nathan Benjamin
Construction Waste Management
Construction Indoor Air Quality: Complying With Smacna Requirements
Monthly Reports
Owner's Perspective: Pursuing LEED Certification / Charley Ryan
ch. 10 Construction Completion
Tasks After Substantial Completion
Pre-Closeout Meeting
Commissioning Activities
Educating The Building Occupants
Training The Operations And Maintenance Staff
Leed Online: Documentation Review
Recs Provider Perspective: Ea Credit 6: Green Power
-Some Common Misconceptions / John Powers
Submit For USGBC Construction Review
Archtect's Perspective: Staying High Performance: Sustaining the Sustainability of Buildings / Michael B. Lehrer
Leed After Occupancy? Or Occupancy After Leed?
Appendices
Appendix A Leed Rating System Scorecards
Appendix B Predesign Site Selection Checklist
Appendix C Project Team Member Roles And Documentation Responsibilities
Appendix D Design Versus Construction Prerequisites And Checklists
Appendix E Owner's Project Requirements Template And Basis Of Design Sample
Appendix F Sample Construction Iaq Management Plan
Appendix G Construction Monitoring And Reporting Forms.