New Search Search History

Holdings Information

    Guidebook to the LEED certification process : for LEED for New Construction, LEED for Core & Shell, and LEED for Commercial Interiors / Michelle Cottrell.

    • Title:Guidebook to the LEED certification process : for LEED for New Construction, LEED for Core & Shell, and LEED for Commercial Interiors / Michelle Cottrell.
    •    
    • Author/Creator:Cottrell, Michelle.
    • Published/Created:Hoboken, New Jersey : John Wiley & Sons, Inc., [2011], ©2011.
    • Holdings

       
    • Library of Congress Subjects:Sustainable buildings--Design and construction.
      Leadership in Energy and Environmental Design Green Building Rating System.
    • Description:xix, 330 pages : illustrations ; 24 cm.
    • Notes:Includes bibliographical references and index.
    • ISBN:9780470524183 (cloth)
      0470524189 (cloth)
    • Contents:Machine generated contents note: pt. 1 Key Concepts
      ch. 1 Measuring Green
      Leed Rating Systems
      Key Concepts Of Leed
      Owner's Perspective: Going for Gold / M. Christie Smith
      Leed Certification Process
      Next Steps Of Coordinating A Leed Project
      Owner's Perspective: Two Questions Every Owner Must Answer for Their LEED Project / Chet M. Roach
      ch. 2 Integrative Project Delivery Process
      Construction Manager's Perspective: From Design to Reality / Bassam Tarazi
      Differences Of A Traditional Project Versus An Integrative Project Delivery
      General Contractor's Perspective: The Importance Of Integration For The Success Of Leed Projects / Travis Hall
      General Contractor's Perspective: Involving A Construction Manager During Design / Michael J. Parnell
      Engineer's Perspective: Integrated Design and Collaboration / Robert Diemer
      Leed And Ipd
      ch. 3 Building A Project Team
      Tiers Of the Credentialing Process
      Owner's Perspective: Building a LEED Team / Bill Stoller
      What is A Leed Coordinator?
      Engineer's Perspective: The LEED Challenge and the Role of Project Coordinator / Wayne Howell
      Selecting The Rest Of The Team Members
      Professional Perspective: The Value Of Certification / Mark Hanson
      Attorney's Perspective: The Risks Of Green Building / Stephen T. Del Percio
      Structural Engineer
      Engineer's Perspective: Offsetting the Costs of Energy Modeling and Commissioning / Paul Meyer
      Commissioning Agent
      Commissioning Agent's Perspective: Selecting A Commissioning Authority / Bill Lodato
      Contractor
      Contracts
      Waste Hauler's Perspective: How LEED Has Changed the Waste Industry / David Cardella
      Coordinator's Perspective: The LEED Coordinator: No One Understands Me! / Steve Leone
      ch. 4 Site Selection
      Education is Key
      Tax Consultant's Perspective: An Introduction To Understanding Section 179D / Dennis J. Stilger, Jr.
      Questionnaire
      Initial Assessment
      Broker's Perspective: LEED-Certified Development Properties vs. Traditional Development Properties / Marie Taylor
      Energy Provider's Perspective: Power Purchase Agreements / RJ Donnelly
      Architect's Perspective: Seeking LEED CI Certification for a Hotel: The Challenges and Benefits / Michael F. Maurer
      Broker's Perspective: Sustainable Design Leads to Good PR and Improved Bottom Line ... If Tenants Can Find a Way to Care / Scott Steuber
      Continuing The Effort To Prepare For The Goal-Setting Meeting
      ch. 5 Eco-Charette
      Architect's Perspective: Collaborative Design / Gary Moshier
      Prior To The Meeting
      Civil Engineer's Perspective: The Importance of Deciding to Pursue LEED Early in the Design Process / Geoffrey B. Nara
      Goal-Setting Meeting
      Contractor's Perspective: LEED Certification: Hurdles to Success / Holly Hawkins
      Owner's Perspective: The Execution of a Certified LEED NC Project / Mike Barbera
      Momentum After The Eco-Charette
      pt. 2 Design Phases
      ch. 6 Schematic Design and Design Development Phases
      Owner's Representative's Perspective: What LEED Credits are Right for You? / Chet M. Roach
      Full Time Equivalent Occupants
      Design Integration Sessions
      Green Roof Technical Expert's Perspective: An Overview of Green Roof Assemblies and Benefits / Melissa Muroff
      Addressing The Prerequisites And Credits
      Architect's Perspective: Managing Passive Loads / Gary Moshier
      Landscape Architect's Perspective: A Landscape Architecture Perspective on the LEED Certification Process / Aiman Duckworth
      Civil Engineer's Perspective: Innovative Sustainable Civil and Site Design for a Nature Center Renovation and Expansion / Geoffrey B. Nara
      Landscape Architect's Perspective: Use 3D Modeling Tools for a Quick and Accurate Measurement of Tree Shading / Aiman Duckworth
      Lighting Designer's Perspective: The Role of a Lighting Designer on a Project Seeking LEED Certification / Faith E. Baum
      Landscape Architect's Perspective: Educate Yourself, the Contractor, the Owner, and Landscape Maintenance Staff about the Project's Planting and Irrigation Approach / Aiman Duckworth
      Architect's Perspective: Mechanical and Architectural Coordination for Energy Efficiency / Nathan Ogle
      Commissioning Agent's Perspective: The Benefits of a Commissioning Agent / Brian Fronapfel
      Mep Engineer's Perspective: The Benefits of the OPR and BOD / Kent D. Hoffman
      Mep Engineer's Perspective: Ea Credit 1: Optimize Energy Performance Compliance Paths / William Amann
      Mep Engineer's Perspective: Refrigeration Compliance for LEED / Christopher F. Zabaneh
      Mep Engineer's Perspective: Engaging an Engineer / Kurt A. Scheer
      Mep Engineer's Perspective: Measurement and Verification for Large-Energy-User Projects / Wayne Howell
      Architect's Perspective: The National Audubon Society: Selecting Environmentally Sensitive Materials / Guy Geier
      Raised-Access Floor Manufacturer's Perspective: Under-Floor Air Distribution System Contributions to LEED Certification / Scott Alwine
      Lighting Designer's Perspective: Benefits of Computer Daylight Simulation / Magdalena L. DiDomenico
      Preliminary Specification Review
      Architect's Perspective: N20-HDR-CUH2A's New Second Office / Jorge Rodriguez
      In Summary
      ch. 7 Construction Document Phase
      Green Roof Technical Expert's Perspective: Quality Assurance of a Green Roof / Melissa Muroff
      Commissioning
      Mep Engineer's Perspective: Energy Modeling Pitfalls / Aaron Dahlstrom
      Whole-Building Simulation
      Specification And Plan Review
      Landscape Architect's Perspective: Design Water as One System / Aiman Duckworth
      Leed-Online Documentation Review
      GBCI Reviewer's Perspective: Top Five Tips for Submitting a LEED Project to GBCI / Martin Mechtenberg
      Manufacturer's Perspective: A Manufacturer as an Owner Pursuing LEED / Julie Smith
      Next Steps
      Engineer's Perspective: Experiences of Gaining LEED Certification / Scott Bowman
      pt. 3 Construction Phase
      ch. 8 Coordination with the Construction Team
      Bid Review
      General Contractor's Perspective: Compliancy with LEED during Construction / Easy Foster
      Training The Construction Team
      Owner's Perspective: The Importance of Collaboration / David Anderson
      Leed Implementation Plan
      Waste Consultant's Perspective: Construction Waste Recycling: Where the Real World Meets LEED / Wayne DeFeo
      Tasks During Construction
      General Contractor's Perspective: LEED during Construction / Michael J. Parnell
      ch. 9 Monthly Reports
      Material Tracking: Getting Started
      Owner's Perspective: Procurement Strategies / Steve Martorana
      Manufacturer's Perspective: A Manufacturer's Approach to LEED / Melissa DeSota
      Salvaged Material Broker's Perspective: Overcoming the Challenges of MR Credit 3: Materials Reuse / Nathan Benjamin
      Construction Waste Management
      Construction Indoor Air Quality: Complying With Smacna Requirements
      Monthly Reports
      Owner's Perspective: Pursuing LEED Certification / Charley Ryan
      ch. 10 Construction Completion
      Tasks After Substantial Completion
      Pre-Closeout Meeting
      Commissioning Activities
      Educating The Building Occupants
      Training The Operations And Maintenance Staff
      Leed Online: Documentation Review
      Recs Provider Perspective: Ea Credit 6: Green Power
      -Some Common Misconceptions / John Powers
      Submit For USGBC Construction Review
      Archtect's Perspective: Staying High Performance: Sustaining the Sustainability of Buildings / Michael B. Lehrer
      Leed After Occupancy? Or Occupancy After Leed?
      Appendices
      Appendix A Leed Rating System Scorecards
      Appendix B Predesign Site Selection Checklist
      Appendix C Project Team Member Roles And Documentation Responsibilities
      Appendix D Design Versus Construction Prerequisites And Checklists
      Appendix E Owner's Project Requirements Template And Basis Of Design Sample
      Appendix F Sample Construction Iaq Management Plan
      Appendix G Construction Monitoring And Reporting Forms.
    Session Timeout
    New Session